Underfloor heating
The underfloor heating described here spreads heat through a hot-water circuit laid in the slab or the screed. It is planned in a new build, or in a renovation when the floor can still gain thickness. Without that height, it is not promised.
AEROVENTIS connects it to the heat source, often an air-to-water heat pump, and to the plumbing. Casablanca, Rabat, Marrakech, Mohammedia, Bouskoura, Tamaris and Zenata do not share the same heating season or the same floors. The visit decides.

Services
Three parts. Each one is drawn before the floor is poured.
Loops
Pipes in the floor, room by room, with a spacing taken from the survey.
Manifolds
They separate the rooms. They sit in a cupboard or a plant space that stays reachable.
Heat source
The heat pump, or another source already planned, feeds the circuit. It is chosen on its own.
Decided on site
What is checked before the floor is fixed.
New build
The loops go in before the screed. Coming back after the finishes means opening the floor.
Renovation
The spare height, the insulation and the planned finish are measured. If the margin is missing, another emitter is the honest answer.
Rooms
A bathroom and a living room do not need the same heat. Loops are separated rather than set with one control.
How it proceeds
The floor closes quickly. The order of the trades matters as much as the layout.
1. Site visit
See the floor build-up, the rooms to heat and the place for the manifolds.
2. Study
Draw the loops and the link to the heat source.
3. Installation and commissioning
Install before the screed, fill the circuit and check that it holds.
4. Maintenance
Leave the manifolds reachable for a later setting or check.
Common questions
What is this underfloor heating made of?
A hot-water circuit in the slab or the screed, connected to a heat source. This page describes that water network.
Is an air-to-water heat pump required?
It often feeds the floor. Another source may already be there. It is not assumed: it is seen, or it is planned with the heat-pump page.
Can it be installed in a renovation?
Only if the floor can still take the insulation, the pipes and the screed without blocking the doors. Otherwise that is said after the survey.
How does it relate to plumbing?
Manifolds, supply and venting are part of the water network. The home's plumbing is looked at at the same time.
Which areas are covered?
Casablanca, Mohammedia, Bouskoura, Tamaris, Zenata, Rabat and Marrakech. The coast and Marrakech do not share the same heating season. The survey stays local.
How do I ask for a visit?
Give the city and whether the floor is still open. A technician arranges a visit before the screed. You can also write on WhatsApp.
Talk about the project
Tell us the city, the district and the type of home. A technician arranges a visit to see the place.



